City of Missouri City Transfer Pump Station

CLIENT: City of Missouri City
LOCATION: Missouri City, TX

In conjunction with the design of a new surface water treatment plant for the City of Missouri City, eHT designed a transfer pump station to deliver potable water to several municipal utility districts (MUDs) in the area. The pump station is fed by a common 48-inch diameter suction line from the 1.5 million gallon clearwell at the plant site and has the ability to independently send water either to MUDs within the northern or southern service areas. The pump station will be built-out in three phases to match the production capacity of the surface water treatment plant. The first phase incorporates two 3,000 gallon-per-minute (gpm) horizontally split case pumps to pump water to the south service area and two 2,000 gpm horizontally split case pumps to pump water to the north service area.

OUR RELATED PROJECTS

Roma Pump Stations

See Our Project

Sweetwater Pump Station and Ground Storage

See Our Project