City of Albany Water Treatment Plant

CLIENT: City of Albany
LOCATION: Albany, TX

eHT conducted a pilot study for an ultrafiltration membrane system for the City of Albany. The pilot study evaluated two sources of water, both in the Brazos River Basin, including pretreatment evaluation and foulant studies. eHT completed the design of the new 2.5 MGD membrane water treatment facility and developed cost estimates and value analyses. eHT also modeled the water quality for process performance. Under the USDA RD funding program, eHT provided planning, design and construction administration services for the new 2.5 MGD water treatment plant. The design incorporated a traditional solids contact clarifier with state-of-the-art membrane filtration. Trihalomethanes (THM) and Haloacetic Acid (HAA5) compliance is achieved using a combination of chlorine dioxide and chloramination. SCADA-integrated process controls were designed and implemented to meet primary drinking water standards.

OUR RELATED PROJECTS

Missouri City Regional Water Treatment Plant

See Our Project

Roscoe Water Treatment Plant and System Improvements

See Our Project

Sweetwater Water Treatment Plant

See Our Project