CLIENT: Abilene ISD |
LOCATION: Abilene, TX |
eHT designed and managed the installation of the latest Revolution artificial playing surface by Field Turf and state-of-the-art Musco field lighting at Shotwell Stadium. Other improvements included additional paved parking, dressing room renovations, electrical and plumbing upgrades and two new restroom complexes.
Additionally, eHT designed the conversion of the Shotwell Stadium grass field to a synthetic turf. Existing grass and sugrade was removed and a polyethylene drain mat, drainage stone and perimeter drainage system was added. The project also included connecting the drainage system to the existing storm drainage system. eHT designed and managed the installation of handicap compliant ramps at each side of the south end of the field to move teams and attendees down to field level.