Acton MUD Standpipe Rehabilitation and Drainage Improvements
CLIENT: Acton Municipal Utility District |
LOCATION: Granbury, TX |
eHT provided project management and design for rehabilitation of the existing 255,000-gallon Standpipe 1. The project included blasting and painting the interior of the standpipe and pressure washing and painting of the exterior. In addition, eHT provided project management and design of a drainage flume and concrete driveway to direct overflow runoff for Standpipe 2.