Caldwell ISD Hornet Stadium

CLIENT: Caldwell ISD
LOCATION: Caldwell, TX

eHT provided civil engineering design and project management for the conversion of a natural grass surface field to Matrix synthetic turf. The turf was chosen for the eco-therm option which is designed to reduce surface temperature by 20 to 30 degrees. The project included demolition of the grass field and utilities and modification and installation of new field utilities. The synthetic turf construction included a geomembrane liner with under drain system, including modifications to the existing drainage system of approximately 93,800 square feet.