CLIENT: City of Breckenridge |
LOCATION: Breckenridge, TX |
eHT provided project management, design, bid phase services, funding application support and construction administration services for this multi-faceted project for the City of Breckenridge. The project included roadway rehabilitation including roadway excavation, new base material, grading, compaction, new hot mix asphalt and concrete pavement and new concrete curb and gutter. A storm drainage system was installed that includes curb inlets, grate inlets, pipe, junction boxes and outfalls. The project included the installation of new water lines and sewer lines in all areas of the paving project. 4,065 linear feet of 4-inch, 3,265 linear feet of 6-inch, 4,005 linear feet of 8-inch and 170 linear feet of 12-inch water lines were installed, as well as 1,050 linear feet of 6-inch, 555 linear feet of 8-inch and 5,750 linear feet of 10-inch sewer line. New driveway approaches and tie-ins to adjoining streets with 4,310 square yards of sidewalk replacement was also included in the project. The project was funded through United States Department of Agriculture (USDA) Rural Development (RD) funding. The project included a Traffic Control Plan and Stormwater Pollution Prevention Plan.