CLIENT: City of Paducah |
LOCATION: Paducah, TX |
eHT provided design and construction management for a new 0.170 million gallons per day (MGD) wastewater treatment plant (WWTP) for the City of Paducah. The project included a new sewage lift station with preliminary treatment, new flow meter and valve vault, new facultative lagoon, irrigation storage ponds, floating irrigation pump stand and center pivot irrigation system to irrigate 65 acres located to the southeast of the WWTP.