CLIENT: City of Pearland |
LOCATION: Pearland, TX |
eHT is providing project management, design, bidding support and construction administration for improvements to the Bailey Water Treatment Plant. The project includes an expansion of the WTP capacity and treatment capability to provide potable water for the City of Pearland up to 4.3 MGD. The project will combine the Magnolia Well and the Bailey Well at the Bailey WTP site to treat the combined flow. The project includes a 1,000,000-gallon prestressed concrete ground storage tank, site and civil design for the new tank foundation, drainage improvements, replacement of high service pumps with two transfer pumps, installation of a transmission pipeline from the existing Magnolia Well Site discharge to the WTP, installation of five aeralaters at the WTP for reduction of iron, manganese, and hydrogen sulfide from groundwater produced by the Bailey and Magnolia wells and electrical and SCADA work. The project also includes addition of a holding pond, demolition of an existing welded steel ground storage tank and addition of a new control building at the Bailey site.