CLIENT: City of San Angelo |
LOCATION: San Angelo, TX |
eHT provided project management, design, and construction administration for Sulphur Draw Wastewater System Improvements for the City of San Angelo (City), which included approximately 1,050 linear feet of 18-inch gravity sewer line to a proposed lift station site, a wastewater lift station, approximately 3,000 linear feet of wastewater force main, force main crossing the Concho River and approximately 2,000 linear feet of trenchless sewer collection system repair.