East North 10th and Maple Street Paving and Drainage Improvements

CLIENT: City of Abilene
LOCATION: Abilene, TX

eHT provided project management, design, survey, and construction management for roadway improvements for East North (EN) 10th Street, including approximately 8,080 linear feet of hot mix asphalt and reconstructing and widening approximately 6,260 linear feet of roadway. The project included a five-lane roadway, two lanes in each direction and one turning lane, and the addition of a sidewalk along the south side of EN 10th Street, as well as the incorporation of design that will allow for a future sidewalk to be constructed along the North side of the roadway. The project incorporated a new curb and gutter system.